Ash and Dirty Water Diversion System
SNK Group was awarded the tender to construct an environmental water management system at Eraring Power Station.
- Excavation and haulage of earth for access to in-service storm water system and pit construction.
- Concrete settling pits were then formed and poured, including blinding slab and weirs.
- Poly pipe welding and install for interconnecting pump lines.
- Procure and install two electric transfer pumps, including high voltage electrical connection into station switchboard.
- Instillation of handrails, signage, Armco railing and lighting around perimeter of works.
The project was completed successfully on time and within budget with zero incidents.
Contact Form
Please fill out the enquiry form below and we will get back to you shortly. Please be as thorough as you can with your message so we assist you as effectively and as timely as possible.